Material and Labour Requirement for Precast Concrete Slab for 1Sqr (=100 Sqft)


Material and Labour Requirement for Precast Concrete Slab for 1Sqr (=100 Sqft)

  • 2) 2” concrete topping (1:2:4), 1/4 chips = 0.17 Cu
  • 3) Cement = 6.5 x 0.17 = 1.12 bags (50kg)
  • 4)  Sand      = 0.5 x 0.17 = 0.09 Cu
  • 5)  Metal    = 0.88 x 0.17 = 0.15 Cu
  • 6)  Floor beams Placing at 2’ c/c = 100 Lft
  • 8)  Labour charges & Transport charges can be changed


Since Quantities have been given now you will be able to calculate the unit rate for the above work by inputting the material cost depending on your area.

Note: Consider about the unit conversions otherwise the calculations will go wrong.


                                    1 Cu = 2.83 Cum






2 comments:

  1. just what most individuals' desire. However, most of which have no idea of the inner thoughts and multi-step means of purchasing a fresh home concrete contractors midland tx

    ReplyDelete
  2. Nice Blogs!
    Thanks for sharing this informative blog.
    Concrete Supplies in Sydney is the second most consumed in the world after the consumption of water. Working as a market leader in the production of concrete, THE YARD offers a wide range of products and solutions. With an unparalleled history of product reliability, development and technical expertise of all products that are specifically designed for a wide variety of applications that includes the industrial, house building, agricultural and commercial applications. Our all products conform to credited quality assurance schemes and meet the standards.
    The Yard Group!

    ReplyDelete

Rate analysis for brickwork in construction

When we analyse a rate for construction work, we can get different answers according the previous records which have been recorded during c...